Independent research libraryEvidence first · sources openHow claims are graded
SCRIBEThe research behind the world’s biggest questions

Research and correction log

Latest updates

A chronological record of significant additions, evidence revisions, corrections and production-state changes across SCRIBE.

12 August 2026

Younger Dryas crater evidence re-audited

SCR-042 now separates impact confirmation from age confirmation. Bloody Creek has been upgraded to its current academic-database status while remaining undated at Younger Dryas precision; Perkins is retained as the strongest direct terminal-Pleistocene age association but not a closed impact diagnosis. The Atlas and Timeline now carry the relevant evidence locations and dated research milestones. The correction log also records the 11 February 2026 PLOS ONE retractions of the Baffin Bay cometary-dust and North American shocked-quartz papers, with links to the editorial retraction notices.

Read the updated investigation →

9 August 2026

Website consolidated into one stable research system

At that stage the public research library used one ten-topic SCRIBE shell across 28 investigations. The Atlas had 60 searchable entries and the Timeline 114 events. The library has since expanded to 79 investigations; this historical update is retained as a dated build record rather than rewritten as current state.

4 August 2026

SCRIBE rebuilt as a research-first library

Nine pillar hubs, a 77-record source library and a documentary cycle were added. Thirteen development narratives were opened into full readable articles, and film status was moved below the research.

4 August 2026

Pillar-balanced bridge investigations built

SCR-015 Mars Life, SCR-016 Animal Consciousness and SCR-017 North Sea Lost World received complete source, claim, story, narration, scene and upload development packs. The first release cycle now has one controlled film path from each of SCRIBE’s nine pillars.

4 August 2026

Research Vault expanded to fourteen controlled records

SCR-005 through SCR-014 were converted from their controlling Drive production packs into searchable development dossiers. Internal controls, rights files and production assets remain private.

4 August 2026

Public launch candidate completed

Canonical URLs, public robots and sitemap files, security headers, privacy and accessibility pages, archive search and contact routing were assembled into the launch package.

4 August 2026

Megalith Series research added

Baalbek, Gornaya Shoria, Aksum and Dolmens were added with source-graded verdicts, uncertainty boundaries and chapter structures.

4 August 2026

Earth and climate research added

Atlantic circulation, carbon mineralisation, lost rivers and European megadrought dossiers were added to the archive.

4 August 2026

The Lost Saharans investigation completed for review

The written investigation, evidence ladder, nine chapters, places network, qualified timeline and peer-reviewed source register were assembled while the film remained in production.

31 July 2026

LiDAR pilot reached its human-review gate

The George V04 review encode reached 75 seconds with nineteen caption cues. Phone, monitor, headphone and device-speaker approval remained open.

Corrections

A correction becomes part of the record.

When a source materially changes an investigation, the page is updated and the change is recorded here rather than silently overwritten.

To challenge a claim, include the SCR identifier, exact wording and the strongest primary or peer-reviewed source available.